Tuesday, November 23, 2010

Week 8 EOC: Evening News

NBC news reporter: "New news from city center, this time its good news, Veer towers are is giving away new technology."

Fox News reporter- “I am here at city Center in front of veer towers and they have an area set up on the street of Las Vegas Blvd with some gadgets they have for veer condos along with free bottle of expensive liquor if you purchase a condo.”

Tuesday, November 16, 2010

Week 7 EOC:Scheduling Issues

What is he/she moving in to? Veer Tower Condos.
There will be a renovation of all the furniture and materials needed from the choosing of the client. Plumbing and electrical will take a 2 to 3 weeks, Flooring will take up to 3 days depending on material. Wall tile will take 4 days along with any paint. Cabinets and counter tops will take 2 week to install. Furniture will take 3 days and accessories will take 1 day. From the point they sign the contract the items will be purchased. This Condo will be designed and look the way you want it!
From contract to move in date how long will it take? If nothing goes wrong at the most 3 months but shooting for 2 months.

Tuesday, November 9, 2010

Week 6 EOC: Professional Sales Presentation

Gathering Pictures and materials of what we want in Veer Condos. Will allow us to video tape one of us and present as we describe what the new bachelor pad would look like.
This will help us sale the condos and possibly allows us to make a better version and make a commercial out of it for marketing purposes.
Maybe taking some pictures and fixing them up with Photoshop we can give the illusion of the bachelor pad with all the electronics that makes your life easier.

Tuesday, November 2, 2010

Week 5; Mid Term

Our project had wows; it was well designed although our presentation was not to par. I feel that we will improve on it. Our Ideas have been well communicated. Our promotion was trough pamphlets, billboards, and word of mouth. We were very selective “evaluating various needs or opportunities, and then deciding which of these should move forward as a project to be implemented,” in the design to sale Veer Tower condos. It did target specific men, had contracts, and produced a design solution. Although I think our presentation came in second. I think we did a good job presenting our information. I think the technology should have been better and that is where we failed and aside from not understand that it had to be presented as if we were in front of Veer management. I think we will take the next step and make it better.
The 4 Interior Design team project was well designed, they communicated their idea very well, and got their word out. Their creativity, technology and viability showed in their presentation. Although it was short and brief they gave a lot of information and presented “the project objective, very clear, attainable, specific, and measurable.” I applaud them for giving a good presentation.
The 4 Interior Design group did a better job in presenting their idea. I think they did a better job in “terminating the project effectively.” Both teams developed networking information, produced a design solution, and applied the principles. All of the presentations where specific, Measurable, agreed upon, realistic, and timed framed.